Wood framing on a house going up
For BC contractors

Run the whole job in one place.

Costs, crew, photos, change orders and invoices, with BC tax and holdback built in. Know what the job actually cost while there is still time to act. Clients you bring stay yours.

  • Free to start
  • No card required
  • Built in British Columbia

Main floor renovation

Budget vs actual

Live
Committed$1,284.40$5,434.40$7,194.40$9,505.15 of $14,200.00
  • Rona — framing lumber

    Receipt
    $1,284.40
  • Delta Electric — rough-in

    Sub invoice
    $4,150.00
  • Own crew — 32.0 h

    Labour
    $1,760.00
  • Pacific Lumber — PO #7729

    Delivery
    $2,310.75

Four sources, one ledger. PST counted as cost, GST held back as recoverable.

Payments on Stripe Connect
Built in British Columbia
NVBC Startup Program
Accelerate Okanagan member

The honest version

Most builders find out what a job cost long after they could do anything about it.

Receipts live in a truck door. Subcontractor invoices sit in email. Crew hours are on a text message. The lumber delivery is on a paper docket somewhere. None of it is wrong — it’s just scattered, so the number that matters doesn’t exist until the bookkeeper builds it in March.

TradeStack puts all five sources of cost into one ledger against one job, the day they happen. The margin is a number you can look at on a Tuesday.

5

cost sources, one ledger

0

spreadsheets to reconcile

BC

tax and holdback rules built in

Job costing

Five ways money leaves. One place it lands.

Photograph a receipt and it is read, coded to a trade and a cost type, and posted against the job. Approve a subcontractor invoice and it posts at full value, with the statutory holdback tracked separately as cash flow rather than cost. Crew hours become labour cost from the timesheets you already keep.

  • Receipts, subcontractor invoices, own labour, deliveries and stock draw — all in one ledger
  • PST is treated as a real cost and GST as recoverable, because in BC you are the consumer of what you install
  • Holdback is cash flow, not cost — 10% by statute, or an explicit zero when you mean it
  • Budget versus actual per line, live, on any job

A photo on site becomes a coded, verified line on the job — without anyone retyping it.

Porcelain tile running low

450 sq ft left · 150 sq ft/day

22% of par3 days of cover

A draft order to Surrey Tile Supply is prepared and waiting. TradeStack never sends it — you do.

Job photos

Every photo on every job. Your crew’s too.

Progress shots, site issues and receipts — from you and from everyone on the crew — land in one place, grouped by the day they were taken. Find the one you need in seconds, and decide which ones your client gets to see.

  • Filter by job, location, who took it, trade, issue or date
  • Crew add photos from their phone, and never see your receipts or costs
  • Nothing goes to your client unless you share it
  • A PDF photo report for any job and date range, ready to send

Main floor renovation

Photos

PDF report
Taken by: anyoneAll tradesThis week

Tue, Nov 4 · 6

2 shared with the client. The rest stay with you and your crew.

Payments

Invoice from the job site. Get paid by card.

Send an invoice from your phone the moment a stage is done. Your client pays by card through Stripe, straight into your own Stripe account — no chasing, no thirty-day silence.

  • Clients pay by card, straight into your own Stripe account
  • No TradeStack fee on clients you bring
  • Link each invoice to its job
  • Every change order and approval is logged — who, when and from where — so there are receipts, not memory
Sent · awaiting payment

Invoice — Rough-in complete

Six photos attached · sent 5 hours ago

Amount due

$4,200.00
Pay by card

Materials & suppliers

Your trade price, your stock, your call on when to order.

Suppliers publish a catalogue; your account sees your own negotiated price, resolved most-specific-first and never stacked. Track stock across locations if you want to — and if you do, materials cost the job when they are consumed, not when they are delivered.

  • Purchase orders that post cost on receipt, in proportion to what actually arrived
  • Optional inventory with append-only movements and moving-average valuation
  • Reorder rules that prepare a draft order and stop there — sending is always a human
  • Cross-supplier comparison on one canonical product, not on whoever spelled it differently

2×4 SPF · utility grade

Three suppliers, one product

  • Pacific Lumber Co.

    Your price

    8% trade discount · 2 days

    $1.42/ft
  • Fraser Valley Cedar

    Next day

    $1.55/ft
  • Heritage Wood Group

    5 days

    $1.68/ft

Twenty trades, in the order you build them

Site & ExcavationDemolitionConcrete & FoundationFramingRoofingWindows & DoorsSiding & ExteriorPlumbingElectricalHVAC / MechanicalInsulationDrywallTileFlooringPaintingFinish Carpentry & TrimCabinetry & CountertopsAppliances & FixturesLandscape & HardscapeGeneral Conditions

Who it is for

Three people, one job, one set of facts.

General contractors

Bid, run the schedule, watch the margin. Post scope from a voice note and a photo, price it from a real supplier catalogue, and see actual against budget while there is still time to act.

Homeowners

Post a project to the contractors you choose, or to every BC contractor on TradeStack, compare bids, and pay your contractor's invoices securely by card.

Crew

Clock on, clock off, snap progress photos, and photograph the dump slip before it goes in the truck door. No amounts to enter, no categories to pick — the office does that part.

How it works

From first bid to final payout.

  1. 01

    Scope it

    A homeowner posts the job, or a contractor captures it on site with voice, photos and a sketch. It comes out as structured milestones.

  2. 02

    Bid and award

    Verified contractors bid line by line, priced against a real catalogue. Compare like for like, award, and the contract is signed digitally.

  3. 03

    Build it

    Crew clock on. Receipts, invoices and deliveries post to the job as they happen. Budget against actual, live.

  4. 04

    Invoice and get paid

    Send the invoice from site. The client pays by card, straight into your Stripe account.

Pricing

Free to start. Priced in Canadian dollars.

Job costing with BC tax and holdback is on every plan. Crew are free, and there's no fee on your own clients.

BC Founding 100

Pro at $49/mo and Business at $129/mo, locked for 24 months

For the first 100 BC contractors · 100 places left · closes April 1, 2027 · billed monthly

Starter

Free

No card needed

  • Job costing with BC tax and holdback
  • 10 invoices a month · no fee on your own clients
  • 1 inventory location
  • At least 2% off Supplier Hub orders
  • Unlimited free crew users

Pro

Most popular

$99 /mo

billed yearly · $129 month to month

Founding price $49/mo

  • Job costing with BC tax and holdback
  • 25 invoices a month · no fee on your own clients
  • 3 inventory locations
  • At least 3.5% off Supplier Hub orders
  • Unlimited free crew users

Business

$249 /mo

billed yearly · $299 month to month

Founding price $129/mo

  • Job costing with BC tax and holdback
  • 50 invoices a month · no fee on your own clients
  • 10 inventory locations
  • Auto-order drafts when stock runs low
  • At least 5% off Supplier Hub orders
  • Unlimited free crew users

Enterprise

Talk to us

For larger firms

  • Job costing with BC tax and holdback
  • Unlimited invoices · no fee on your own clients
  • 50 inventory locations
  • Auto-order drafts when stock runs low
  • At least 7.5% off Supplier Hub orders
  • Unlimited free crew users

Compare every feature, plan by plan · Prices in CAD, before tax · Cancel any time

Questions

The things builders ask first.

What does it cost?

It is free to start. There is no card required to sign up, and we will give plenty of notice before that changes.

Do I have to move my whole business onto it?

No. Plenty of people start with one job. Receipts and cost tracking work on their own without using the marketplace, and the marketplace works without inventory. Turn on the parts you want.

Is inventory tracking required?

It is off by default and most builders never need it. If you switch it on, deliveries fill stock and the job is charged when materials are consumed instead of when they arrive — so the same materials are never counted twice.

Why does BC matter so much here?

Because the tax and lien rules change the numbers. In BC a contractor is generally the consumer of what they install, so PST is a real cost while GST is recoverable — a tool that lumps them together overstates the job. The Builders Lien Act holdback is 10% and it is cash flow, not cost. Those rules are built in rather than bolted on.

Where does the money actually sit?

With Stripe. Invoice payments go straight to the contractor's own Stripe account. TradeStack never holds your money.

Can my crew use it without seeing my margins?

Yes. Crew see the jobs they are on, their own hours, the receipts they photographed themselves, and the job photos on those jobs. They cannot see budgets, costs or anyone else's receipts.

Who sees my job photos?

You, your team and the crew on that job. Your client sees only the photos you choose to share with them, and receipt photos are never shared.

Free to start

Start with one job. See what it really cost.

Open to contractors and homeowners across British Columbia. Two minutes to sign up, and nothing to migrate.

Already have an account? Sign in